SECTION 1.6- PROJECTS ASSOCIATED WITH BPC & ENGINEERING SERVICES
A AIRPORT PAVEMENT INVESTIGATION, TESTING AND REPORTING .
1 JOMO KENYATTA INTER RUNWAY TAXWAY AND APRON;-
Pavement Investigation, surface inspection, Trial pitting, logging, sampling, sounding, Coring, lab testing and reporting and re-instatement for test pits with cold asphalt. Geotechnical investigation for the new Taxiway extension sampling, testing and reporting. All logistical arrangements to comply with Aviation rules.
Client:Netherland Airport consultant co (NACO), Year 2004/5
2 ISIOLO AIRPORT RUNWAY,TAXWAY,APRON,OFFICES
Pavement investigation for existing runway by Trial pitting Field and Lab testing,
Material Investigational for the new proposed new apron ,tax ways. alignment Aprons investigation, field and lab testing reporting for Office Block Cargo warehouse,parking bay, access roads,Staff residential areas and material borrow areas.
3.KISUMU AIRPORTRUNWAY,TAXWAY,APRON,OFFICE
Scoping of works, Existing Pavement investigation, coring & Layer sounding, Trial pitting and material borrow areas.
Geotechnical investigation for the proposed new office and parking area.
4.Wilson Airport
Asphalt mix design and quality control
KUOJOK WFP AIR STRIP-BARGHAZAL –SOUTH SUDAN
Pavement investigating and scoping of works
WHITE NILE OIL EXPLORATION AIR STRIP-JONGLEI STATE JALEE OIL FIELD –SOUTH SUDAN
Material investigating, Testing, Pavement, Design and Construction.
B. BUILDINGS FOUNDATION INVESTIGATION, TESTING AND REPORTING .
We have also been associated with various building in Nairobi, Tanzania, Uganda and Southern Sudan.;-
QUALITY CONTROL E.G.
Tele-postal House, Safaricom House, Celtel House, CBA Headquarters,TSC Landmark. USIU Library, JKUAT,Civil Servant quarter quarter,Ziana Springs,komarock Phase 2 & 3,Tuskys Thika, Buruburu, Ongata Rongai,Handy Forwarders Cargo handling facility, Ruwenzori &Conrad Plaza in uganda,Mabati Rolling Mill parking yard.
INSITU PERMEABILITY
Coca Cola Msa, Moi University Eldoret; KCB College Karen.
Water and Filter media testing and Design for Juba Water
Supply.
STRUCTURAL INTERGRITY TESTING
Concrete Coring and testing for Muchai House,ADAK house
USA Embassy.
4.MTN head office in Kigali-Rwanda. Foundation Design 2009

Auger Bore SI-Jica dam-Bugesera Rwanda
C. ACTUAL CONSTRUCTION WORKS
1 Juba port parking area, piled jetty, warehouse, river protection,
2 Access road from foundation, sub grade, sub base, Optimum
Mechanical and Chemical stabilized, double surface dressing
bituminous standard, road furniture and painting.
3 Placing of water pipers, storage tanks, troughs for Munuki
village in Juba.
4Construction of oil well drilling foundation, stabilization, 2no
staff living camps, sewerage system, drainage.
5. Construction of 1.5km long airstrip and its drainage system.
6. Construction of 20km dyke to protect the oil field from Nile
River waters.
7. Construction of a driller camp and drainage systems.
Back to top |

|
D. TELECOMUNICATION PROJECTS
Foundation investigation, field and lab testing, data analysis and reporting and construction and quality control testing for Base transmission stations for:-
- Safaricom GSM over 100 sites
- Telkom CDMA over 75sites
- Econet GSM over 20 sites
- Zain Sudan over 7 sites
E. ENERGY
2No Mini Hydro Electric Plant Butare and Ruhengeri-Rwanda.
Site investigation, testing and Grouting Design and placing 2000Lts of Grout.
1- SOUTH SUDAN OIL FIELDS-WHITE NILE
Foundation investigation field and lab testing including over water site investigation, reporting, implementation and actual construction of oil well
a)Drilling Tower platform, Generator & Draw works Slabs, supply path, b)30 km access roads, c)2 airstrip, d)14km dyke e)2 Living camps, staff mess, Fuel tank, Helicopter pad, sewerage systems in Jongolei oil Fields in South Sudan.
2-HYDRO-POWER STATIONS
- Route selection and topographical survey for power sub station, Transmission line, Kisii Chemosit and Masinga –Embu-Meru line
- Ken Gen power Substation in Rabai
- Slope stability Design for Olkaria
- Bujangali Hydro power
- Siginda –Arusha Transmission line
- Gitaru,Kamburu Power station
- Independent power producer in Nakuru and Eldoret
F. ROAD ALIGNMENT
- Juba port Access Road and parking testing and engineering report, pavement design andarea-Pavement investigation, sampling ,Field and Lab testing and locating of Material site and borrow area, Gravel and Rock quarry then commissioned to construct Juba port yard, access roads from formation to Bituminous standard including all quality control and compliance testing in southern Sudan.
b.Material investigation and Survey works along road alignment and for potential borrow/quarry for utilization, Locating ,sampling ,testing and report on :-
- 237km road wau- Abye for WFP in Southern Sudan.
- Sultan Hamud-Mtito Andei
- 237km road wau- Abye for WFP in Southern Sudan,
- Sultan Hamud-Mtito Andei
JICA PROJECTS
3no IRRIGATION DAMS in Eastern Rwanda-Bugesera,Remera and Rulenge.Site investigation, Geological study, in-situ permeability for Sanyu Consultants Inc.
KENYA MEDICAL RESEARCH INSTITUTE
- Topographical survey, site investigation, sampling, field & lab testing and reporting- JICA funded KEMRI Infected Parasite Diseases Control Centers at KEMRI HQ Nairobi, Kwale and Busia.
- Juba port Jetty and Access Road.
- Munuki water supply
- Mwingi water Supply
- Eastern Rwanda Irrigation Dams at Runenge, Rumera and Gashora
p)Topographical survey, ground investigation, testing reporting for KP&LC substation And Diesel power generated for KPL&LC, ABB and siemen & sites.
q) Foundation investigation for the US Embassy,
r) Material testing ,Grating test for Kenya Port Authority birth.
s) Site investigation testing report, installation of pitting in Juba.
t) Chemical testing for:-1) Munuki Water supply in Juba,
2) Muranga Water Supply
u) Ground contamination permeability potential for Eveready and Caltex.
v) Structural congruity assessment for cooperative house( Bob blast Blast) and , Carile College main Administrative. |